Sl. No. |
Client |
Project |
Job Description |
1. |
Reliance Energy Limited, Mumbai. |
6X660 MW SASAN ULTRA MEGA POWER PROJECT, MP. |
Fuel Oil Handling System on EPC basis for 6X660 MW SASAN ULTRA MEGA POWER PROJECT, MP. |
2. |
National Thermal Power Corp.Ltd., Noida (U.P) |
2x500 MW Rihand Super Thermal Power Project |
Fuel Oil Handling System for Rihand Super Thermal Power Project (2x500 MW) |
3. |
National Thermal Power Corp.Ltd., Noida (U.P) |
4x250 MW Nabibagar Thermal Power Project |
Fuel Handling System for Nabibagar Thermal Power Project (4x250 MW) |
4. |
Lanco Infratech Ltd., Gurgaon |
3x660 MW Koradi TPS, at Koradi, |
Fuel Oil Handling system for 3x660 MW Koradi TPS, at Koradi, Nagpur, Maharashtra |
5. |
L&T Limited, Faridabad |
2x700 MW Rajpura TPP, at Rajpura, |
Misc Tank System for 2x700 MW Rajpura TPP, at Rajpura, Punjab |
6. |
Adani Power Ltd, Ahmedabad |
5x660 MW Tiroda TPP, at Maharashtra |
DM Water Tank System for for Tiroda Thermal Power Project |
7. |
Maharashtra State Electricity Board |
New Parli Thermal Power Project, Stage-I (1x250MW ) |
Design, Supply, Fabrication, Erection, Testing & Commissioning of Fuel Oil Storage & Handling System on turnkey basis along with related Civil, Mechanical, Electrical & Instrumentation Works. |
8. |
National Thermal Power Corp., Noida, (U.P) |
Sipat Super Thermal Power Project, Stage-II (2x500 MW) |
Design, Supply, Fabrication, Erection, Testing & Commissioning of Fuel Oil Unloading/Storage and Handling System Package on turnkey basis. |
9. |
Punj Lloyd Ltd., Gurgaon/ Rajasthan Rajya Vidyut Utapadan Nigam, Jaipur |
Chhabra Thermal Power Project, 2x250 MW |
Design, Supply Fabrication, Erection, Testing & Commissioning of Fuel Oil Storage & Handling System on turnkey basis along with design of Civil Works. |
10. |
National Thermal Power Corp., Noida, (U.P) |
Sipat Super Thermal Power Project, Stage-II (2x500 MW) |
Ash Water Recirculation System for Sipat Super Thermal Power Project Stage-II (2x500 MW), Including Civil, Mechanical, Electrical and Instrumentation jobs. |
11. |
BALCO, Korba |
1200 MW TPP at Korba Plant |
Intake Water Supply Pipeline for 1200 MW TPP including Civil, Mechanical, Electrical & Instrumentation Works. |
12. |
National Thermal Power Corp., Noida, (U.P) |
Vindhyachal Super TPP |
Design, Engineering, Manufacturing, Supply of Ash Water Recirculation Package for Vindhyachal TPS for Stage I & II including 1000mm NB x 6300 RM and 700 NB x 5500 RM Pipelines with total pumping capacity of about 10,000M3/hr. The Total work on EPC basis consists of Pipelines, Pumps, Electrical, Civil & Instrumentation Works. |
13. |
Jindal Steel & Power Ltd., New Delhi |
Raigarh Power Plant |
Make-up Water Piping Works for Raigarh Plant along with related Pumping and Electrical Works. |
14. |
National Thermal Power Corp., New Delhi |
Kayamkulam C.C.P.P.(1x400 MW) |
Design, Engineering, Supply, Fabrication, Erection, Testing and Commissioning of Make-up Water Piping System at Kayamkulam 400MW Combined Cycle Power Project with 8 kms of 550mm Dia Pipeline & Total Pumping Capacity of over 2000 M3/hr. |
15. |
Rajasthan State Electricity Board Jaipur/Development Consultants |
2 X 250 MW Suratgarh Power Project |
Fuel Oil Handling and Storage System Installation including Civil , Mechanical, Electrical, and Instrumentation works on turnkey basis. |
16. |
Bharat Gears Limited, Faridabad |
Gear Manufacturing Plant |
Design, Supply, Erection, Testing and Commissioning of Propane & HSD Storage and Handling System, Plant Utility Piping System and Total Plant Electrical Works. |
17. |
Hetauda Cement Ind. Limited, Nepal |
Cement Plant |
Design, Manufacture, Supply & Installation of all Machinery Equipment & Piping, Valves & Accessories of Plant Utility Services including Fuel Oil Storage and Unloading System. |