Sl. No. |
Client |
Project |
Job Description |
1. |
Reliance Energy Limited, Mumbai/Sasan Power Company Ltd. |
6X660 MW SASAN ULTRA MEGA POWER PROJECT, MP. |
Laying of Raw Water Pipeline 1200 DIA X 45 KMS for 6X660 MW SASAN ULTRA MEGA POWER PROJECT, MP. |
2. |
Bajaj Infra Development Corporation Ltd. |
3x660 MW Super Thermal Power Project at Lalitpur (UP) |
Erection of Raw Water System Package comprising of 1600mm dia 45 Kms long gunnited pipeline for Lalitpur Super Thermal Power Project (3x660 MW) at Lalitpur (UP) |
3. |
Hindustan Zinc Limited |
30 MLD Water Pipeline system |
30 MLD MS Water Pipeline system (600mmNB & 700mm NB 80Kms) from Udaipur to Dariba including Pumping, Electricals, Instrumentation and Civil works. |
4. |
Jindal India Thermal Power Ltd, Delhi |
2 X 600 MW THERMAL POWER PLANT AT DERANG, ANGUL |
River Water Intake System for 2 X 600 MW THERMAL POWER PLANT AT DERANG, ANGUL, ODISHA, involving 1200 NB x 14 KMS Cross country pipeline with complete pumping, electrical, civil and instrumentation works |
5. |
Rolls Royce Industrial Power (India) Ltd., Hyderabad, Andhra Pradesh |
Godavari Gas Power Project 208 MW |
Design, Engineering, Supply, Fabrication, Erection, Testing and Commissioning of 450 NB, 16 kms API 5L Gr.B Make-up Water Pipeline including related approach Roadworks, Civil works & Anticorrosive Treatment in addition to temporary & permanent Cathodic Protection. |
6. |
Afcons Infrastructure Ltd., Mumbai, Engineers India Ltd. |
CPCL Nagapattinam |
Detailed Engineering, Supply and Laying of 20"NB, 10 kms Aboveground/underground Cross-Country Crude Line for CPCL (MRL)-Nagapattinam project. |
7. |
Hindustan Zinc Limited, Udaipur |
Zawar Mines CPP |
Design, Engineering, Supply, Fabrication, Erection, Testing and Commissioning of 450 NB, 14 kms Make-up Water Pipeline from Tidi Reservoir to Zawar Mines CPP, including related Anticorrosive Treatment -Gunniting and laying the pipeline in a hilly/rough terrain including partly alongside the river bed. |
8. |
Maharashtra State Electricity Board, Mumbai |
2 x 500 MW Chandarpur TPS |
Supply, Fabrication, Erection, Testing and Commissioning of 64 kms Ash and Sludge Disposal Pipelines on turnkey basis. |
9. |
Gas Authority of India Ltd., New Delhi, Engineers India Ltd. |
UP Petro Chemical Complex Auraiya |
Erection, Testing and Commissioning of 9 kms 550 NB
Cross-Country Effluent Disposal Pipeline with Cathodic
Protection System. |
10. |
National Thermal Power Corp., New Delhi |
4 x 210 MW Dadri NCTPP |
32 kms Cross-Country Pipelines as a part of CW System Equipment-Tubewell Network Piping Package. |
11. |
National Thermal Power Corp., Noida, (U.P) |
Sipat Super Thermal Power Project, Stage-II (2x500 MW) |
750 mm Dia Ash Water Recirculation Cross-Country Pipeline as a part of Ash Water Recirculation System for Sipat Super Thermal Power Project Stage –II (2x500 MW). |
12. |
Jindal Steel & Power Ltd.,
New Delhi |
Raigarh Power Plant |
Make up Water Cross-Country Piping 600NB 22 kms (2 x 11 kms ) for Raigarh Plant, as a part of Make-up Water Supply System. |
13. |
BALCO, Korba |
1200 MW TPP at Korba |
Plant Intake Water Supply Pipeline for 1200 MW TPP including Civll, Electrical & Instrumentation works. |
14. |
National Thermal Power Corp., Noida, (U.P) |
Vindhyachal Super TPP |
1000 mm Dia & 700 mm Dia Cross-Country Pipeline as a part of Ash Water Recirculation Package for Vindhyachal TPS for Stage I&II. |
15. |
National Thermal Power Corp., New Delhi |
Kayamkulam C.C.P.P. (1x400 MW) |
8 kms of 550 mm Dia Cross-Country Pipeline as part of Make-up Water Piping System at Kayamkulam 400MW Combined Cycle Power Project. |